Project Overall summary

Water System Construction Project (WASH in School) is being implemented in the Roman Catholic Primary School Juma Village Kori Chiefdom and Ahmadiyya Muslim Primary School Saluibu Village, Kowa Chiefdom in Moyamba District.

 

It involves the following:

  • Construction and installation of two hand dug wells in two primary Schools in Juma and Saluibu villages in Kori and Kowa Chiefdoms, respectively..
  • Construction of perimeter fence with gate for both wells.

 

Overall project progress

The overall project progress is as follows:

  • Excavations of wells, lining, fabrication of caisson headwall, sinking of the wells have been completed in both locations (Roman Catholic Primary School Juma Village and Ahmadiyya Muslim Primary School Saluibu Village).
  • Transporting of sand for molding of blocks for the fence has started.

UPDATES ON RESULT

Activities

Status of out put

Remarks

Excavation

Excavation of both wells in Schools Juma and saluibu villages has been completed.

Excavation completed

Lining, apron and headwall

Lining, apron, and headwall of both wells with 4 inches concrete thickness with the ratio of 1:2:4 mixture, have been completed

Lining completed

Construction of caisson

4 meters caisson with 6mm mild rod to shaft and concrete work with paced at 225mm with 4 inches thickness have been constructed in both well.

Caisson construction has been completed

Sinking

Three meters of caisson concrete have been sink below the water table in other to achieve a minimum of two meters of water column during the dry season.

Sinking of both wells has been Completed.

 

 

Construction of perimeter fence

Transportation of sand for moulding of blocks for perimeter fence has been done

Transportation of sand for fence construction has been completed.


Challenges

  • Community road network is a serious challenge in both Chiefdoms

Lessons learnt

  • The involvement of the stakeholders in the implementation of the project encourage total involvement by the Chiefdom authorities..

 

Pictures of targeted communities showing progress and quality of work.

Water Point

Status of Activities

Locating (Name of community)

Ahmadiyya Muslim Primary School Saluabu

 

Briefly describe status by stage and show progress with a picture. Lining and caisson constructed completed

 

Locating (Name of community)

Ahmadiyya Muslim Primary School Saluibu

Briefly describe status by stage and show progress with a picture. Construction of apron completed

 

 

Locating (Name of community)

Ahmadiyya Muslim Primary School Saluibu

Briefly describe status by stage and show progress with a picture. Fixing of pedestrian and manhole cover

 

 

 

 

Locating (Name of community)

Roman Catholic Primary School Juma

 

Briefly describe status by stage and show progress with a picture. Construction of caisson.

 

Locating (Name of community)

Roman Catholic Primary School Juma

Briefly describe status by stage and show progress with a picture. Construction apron has been completed

 

 

Locating (Name of Community Roman Catholic Primary School Juma

Briefly describe status by stage and show progress with a picture